LKE 0.00% 3.8¢ lake resources n.l.

Ann: Resource Connect Asia Future Facing Commodities Presentation, page-20

  1. sqe
    6,939 Posts.
    lightbulb Created with Sketch. 3626
    "how many pumps will be needed and how will they be powering said pump’s"

    Exactly. The fact they still haven't done this work is shocking at best, negligent at worst.

    Number of pumps required is based on the following variables
    1) Plant capacity (ie 50ktpa)
    2) Brine grade
    3) process efficiency (ie recovery rate)
    4) brine flow rate (ie pump rate)

    From that you can calculate number of pumps. Bommer ballparked this at 60+GL per annum of brine, which based on a pump rate of 20L/s will require circa 100 pumps to extract the brine, and a further 100 pumps for reinjection.
 
watchlist Created with Sketch. Add LKE (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
0.000(0.00%)
Mkt cap ! $63.40M
Open High Low Value Volume
3.9¢ 3.9¢ 3.7¢ $47.24K 1.248M

Buyers (Bids)

No. Vol. Price($)
6 160636 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.8¢ 1073748 5
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
LKE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.