GCM 0.00% 0.3¢ green critical minerals limited

Ann: FURTHER SPG BATTERY ANODE POTENTIAL AT MCINTOSH GRAPHITE, page-2

  1. 5,113 Posts.
    lightbulb Created with Sketch. 659
    The following works are underway as a matter of priority to advance the McIntosh Graphite Project:
    • Maiden drill program – on track for commencing May 2023
    • Preliminary Ore sorting study
    • Metallurgical testwork campaign
    • Battery Anode qualification testwork commencement
    • Downstream Processing Facility Scoping Study including a site selection study
    • Delivery of updated McIntosh Upstream Pre-Feasibility study

    Plenty to look forward to here for the remainder of the year, buying at this ridiculous low price. I feel this will break out here real soon.
 
watchlist Created with Sketch. Add GCM (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $3.671M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
7 5811228 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 4630825 7
View Market Depth
Last trade - 16.12pm 13/09/2024 (20 minute delay) ?
GCM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.