ASQ 4.17% 2.5¢ australian silica quartz group ltd

any news??, page-15

  1. 672 Posts.
    Bauxite talks in Bindoon continue

    About 100 people attended
    the Conversation with the
    Community meeting held by
    Bauxite Resources Limited
    (BRL) at the Bindoon Town Hall
    recently to hear information
    and ask questions about BRL's
    proposed bauxite mining
    operations in the Bindoon area.
    Derek Gascoine, Convenor
    of Residents for Responsible
    Mining (R4RM), the community
    group formed to address
    concerns about the impacts
    of BRL's mining in the Shire
    of Bindoon said the majority
    of questions and statements
    from attendees were hostile to
    the concept of further bauxite
    mining in the Shire.
    "Major concerns expressed
    by community stakeholders
    present included the sourcing
    of industrial water, dust
    and noise emissions, dieback
    spread, salinity, trucking
    frequency, road safety,
    road degradation and the
    complete lack of information
    about BRI:s plans after
    Stage 2," Mr Gascoine said.
    "The consensus of R4RM
    members present is that the
    meeting was a token gesture
    on the part of BRL. It was held
    out to be an information session
    and a `workshop' but it was
    conducted improperly.
    "The information provided by
    BRL tended to be incomplete
    and in some instances
    inaccurate, with insufficient or
    incorrect facts provided. For
    example, no maps, plans or
    other information about the
    subject matter was provided to
    participants prior to, or even
    at the meeting other than a
    brief PowerPoint presentation
    which did not address the valid
    concerns of the community."
    "No map was provided of Lot
    M2110 (approximately 70 Ha)
    - the proposed site of BRL's
    next mine (Stage 2) which has
    been referred to the EPA for
    assessment. The Stage 2 site
    was described by BRL's officers
    as having very few trees and
    not being near the Julimar
    Conservation Park. However
    R4RM distributed a map to
    the meeting attendees which
    clearly showed the block to
    be both heavily forested and
    adjacent to the park."
    "We trust that EPA will withhold
    approval until such time as
    BRL adequately addresses the
    serious and negative impacts
    of its operations, such as those
    suffered by Bindoon residents
    during BRL's first mining
    phase," Mr Gascoine said.
    Copyright
 
watchlist Created with Sketch. Add ASQ (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
0.001(4.17%)
Mkt cap ! $7.046M
Open High Low Value Volume
2.5¢ 2.5¢ 2.5¢ $490 19.58K

Buyers (Bids)

No. Vol. Price($)
2 5079 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 11024 1
View Market Depth
Last trade - 12.18pm 18/07/2024 (20 minute delay) ?
ASQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.