IVZ 1.61% 6.3¢ invictus energy ltd

Ann: Quarterly Report & Cashflow, page-41

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    "But i suspect if well drilling was more straight, side track would have been easier, ie less chance for wireline logging tool to get stuck,"

    Well trajectory is only a factor in causing tool/cable sticking if there is key seating going on. This wasn't the case in M1 and the sidetrack. The problems getting logging tools down and tools and cable getting stick were hole related...namely differential sticking (related to mud weight/fluid loss and high formation permeability) and time dependent mechanical hole deterioration.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
6.3¢
Change
0.001(1.61%)
Mkt cap ! $89.32M
Open High Low Value Volume
6.2¢ 6.4¢ 6.0¢ $308.9K 5.008M

Buyers (Bids)

No. Vol. Price($)
1 160000 6.2¢
 

Sellers (Offers)

Price($) Vol. No.
6.3¢ 147648 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.