as of 1st May...all the gear has been shifted from LKR-2
and made its way to NED-1. Not sure if it has spud yet, but should be any day now. Not sure if MIN will announce.
NED-1 is the best location on the structure. Prospective for oil in the Wagina-Dongara and Gas in the Kingia.
After NED-1 is done, the rig goes to STX for what originally was meant to be 2 holes. If you read the STX anns, it says they have scored an extra rig slot - they now will drill 3 holes. So I guess LKR3 will not be drilled. MIN is saving one rig slot presumably to be drilled after they have had a chance to look at the 3D seismic and results of NED-1.
Lockyer field is not done yet. Would have been better all around if NED-1 was drilled first.
- Forums
- ASX - By Stock
- MIN
- NWE Refugees
NWE Refugees, page-78
Featured News
Add MIN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$38.47 |
Change
0.010(0.03%) |
Mkt cap ! $7.560B |
Open | High | Low | Value | Volume |
$37.50 | $39.16 | $37.50 | $117.0M | 3.062M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 285 | $38.44 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$38.53 | 528 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 285 | 38.440 |
1 | 90 | 38.400 |
1 | 175 | 38.320 |
5 | 1384 | 38.000 |
1 | 500 | 37.910 |
Price($) | Vol. | No. |
---|---|---|
38.530 | 528 | 1 |
38.590 | 580 | 1 |
38.700 | 1500 | 2 |
38.770 | 25 | 1 |
38.800 | 1030 | 2 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
MIN (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online