Totoally agree with you in regards with Toyota. It's a little different out on a real building site and not in a controlled environment. With them Porotherm blocks, thay are designed to be pushed together and lock with a tounge and groove at the perp ends. Not with a 40 to 50 mm gap filled with foam backing rod as shown in previous videos and photos. Automation will eventually come with masonry but definitely not the way FBR are proposing.
- Forums
- ASX - By Stock
- FBR
- FBR General Discussion
FBR General Discussion, page-3414
-
- There are more pages in this discussion • 4,755 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.9¢ |
Change
-0.001(2.00%) |
Mkt cap ! $236.3M |
Open | High | Low | Value | Volume |
5.0¢ | 5.1¢ | 4.7¢ | $383.5K | 7.767M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 140315 | 4.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.9¢ | 720789 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 140315 | 0.048 |
7 | 944716 | 0.047 |
10 | 925868 | 0.046 |
10 | 1436960 | 0.045 |
4 | 763636 | 0.044 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 720789 | 3 |
0.050 | 1244446 | 4 |
0.051 | 306536 | 3 |
0.052 | 1404632 | 5 |
0.053 | 1565689 | 5 |
Last trade - 16.10pm 01/10/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online