To build today a producing plant with , roads , energy supply ,accommodation camp , water, earth moving /truck fleet gold pour room and
all other facilities ,you are looking at between 180 million up to 280 million dollars worth depending on amount of ounces to be produced. Expensive and very time consuming . BGD basically have most of the above already plus air strip. Probably 15 to 30 million would get the ball rolling which is a huge advantage to have up your sleeve. However BGD would have to find at least in my opinion another million ounces because the grade is low, In saying that CMM pulled it off with low grades and are FLYING along.
- Forums
- ASX - By Stock
- BGD
- Ann: Tunkillia Mineral Resources grow 20% to 1.15 Million oz
Ann: Tunkillia Mineral Resources grow 20% to 1.15 Million oz, page-18
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BGD (ASX) to my watchlist
(20min delay)
|
|||||
Last
25.3¢ |
Change
-0.008(2.88%) |
Mkt cap ! $55.21M |
Open | High | Low | Value | Volume |
26.0¢ | 26.0¢ | 24.0¢ | $65.21K | 260.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2076 | 25.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
26.0¢ | 76554 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2076 | 0.250 |
1 | 20000 | 0.245 |
3 | 63648 | 0.240 |
1 | 30000 | 0.235 |
2 | 23739 | 0.230 |
Price($) | Vol. | No. |
---|---|---|
0.260 | 76554 | 4 |
0.265 | 159711 | 2 |
0.270 | 8955 | 1 |
0.285 | 31971 | 2 |
0.290 | 5000 | 1 |
Last trade - 15.53pm 04/10/2024 (20 minute delay) ? |
Featured News
BGD (ASX) Chart |