AZS 0.00% $3.69 azure minerals limited

Banter and general comments, page-685

  1. 730 Posts.
    lightbulb Created with Sketch. 202
    The feasibility may take 14 years to run a powerline to site and to finance the project, the feasibility will be quicker and financially backed if th NPV is high enough. Which is grade and tonnes minus capital and operating costs.

    again you just need world class intercepts like WR1. Too bad for WR1 it's almost in a absolutely non inhabitable location which will see investors look towards deposits close to infrastructure

 
watchlist Created with Sketch. Add AZS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.