This was the conclusion for work done so far;
"Please find attached the results of our recently completed well tests. I am very pleased to advise that both Orita 2 and 4 wells have passed their safety and well integrity tests. This allows us to move into well clean out and flow testing, in preparation of our JORC compliant resource report. We cannot be certain of exact dates, as this is predicated by next stage permit approval, but we anticipate completion of this next phase of works, on or about end of June. We will update you on results, once they are to hand."
Some of the detail in the report suggests some corrosion in some sections needs to be cleaned out prior to flow testing but it looked like the wells will be good for flow testing. That was the aim. I'm guessing new wells would be drilled for commercial production but these flow tests from these wells will give us the JORC which will add value for us well before commercial production and the company is reportedly likely to be bought out so we won't be worrying about or paying for production wells.
- Forums
- IPOs
- Phoenix Water - PXW - Lithium - 100x
Phoenix Water - PXW - Lithium - 100x, page-301
-
- There are more pages in this discussion • 1,934 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Featured News
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries