Mallina is very close to TVL's and recharges lithium sulphate plan, in Port Hedland.
Alex Cheesman spent quite some time showing the Brits around WA Li mining sites which I assume included SYA tenements.
TVL are doing what Green Lithium want to do but have Recharge funding it.
The source of funding to buy Britishvolt, to set up a battery factory in Geelong, to build a intermediary Li product is still a mystery.
As I have said before it the Military IMO
https://www.rechargeindustries.com/...-valley-lithium-to-supply-lithium-hydroxide-1
Ann: Mallina drilling intercepts 23 metres of pegmatite, hosting, page-10
Add to My Watchlist
What is My Watchlist?