"Are the modular mobile plants able to process the volume of ore coming from open cut vs higher grade underground ore."
Should be able to cope on a restricted basis, Robo, at least enough to get some $$$$ in.They've been used for small open-cut operations before.
GZ
- Forums
- ASX - By Stock
- TTR
- phillips river project feasibility and funding
phillips river project feasibility and funding, page-11
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)