The holes being drilled on Mongolia are 300 meters, not 2000 like in the PB.
Drilling 100s of these, as we’ve seen are much quicker and particularly over there in Mongolia
Furthermore, take a look at BLU, drilling in the Bowen basin. Has taken some time to dewater due to the care needed to look after the production coals.
Much patience required either way
- Forums
- ASX - By Stock
- TPD
- Ann: TMK: Lucky Fox - 3 Drilling Completed
Ann: TMK: Lucky Fox - 3 Drilling Completed, page-42
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
SKS
SKS Technologies wins US$90M award to supply power to international hyperscale data centre in Melbourne
FWD
Queensland's housing crisis an opportunity for ASX builder Fleetwood – and taxpayer cash a safe harbour from the storm