STT Week end winter 2nd June 2023, page-18

  1. 6,069 Posts.
    lightbulb Created with Sketch. 294
    STTCOMP ZEU Fa Long
    soi 438mil
    mkt cap $17m
    cash $2m
    last traded 4 cents
    zeuo last traded 1.6 cents
    Zeu is exploring in the Gascoyne region of WA for Lithium smack bang between DLI and VSR ground.
    From company
    HIGHLIGHTS
    Program-of-Work (PoW) was approved for the Phase 1 drill program at Mortimer Hills Lithium
    Project, Gascoyne Region, Western Australia.
    • A large number of outcropping pegmatites have now been identified and confirmed in the
    Pegmatite Creek Prospect area of the Mortimer Hills Project.
    • An initial drilling program for about 1,700m is now planned for early June and will concentrate
    on drilling directly into the mapped pegmatites from surface. The pegmatites are centrally
    located in E09/2147 and are found similarly across the granite greenstone contact along the strike
    from the Yinnietharra Lithium Project (https://deltalithium.com.au/our-projects/yinnetharralithium/) developed by Delta Lithium Limited (ASX: DLI) to the northwest.
    • The drilling service provider has been confirmed. The Aboriginal Heritage Desktop Assessment
    of the Mortimer Hills Project has been finalised.
    • Drilling targets are within “Volta Corridor” (Figure 1) – a major lithium-bearing pegmatite belt in
    which DLI is developing and enlarging the Yinnietharra Lithium Project on our neighbouring
    tenement.
    • A Program of Work (PoW) for Phase 2 drilling has also been lodged to cover follow-up drilling on
    the interpreted extent of the prospective lithium ground on E09/2147, closer to the growing DLI’s

    Was ready to tip last week but last minute drama. Volume and price breakout on Friday announcement this week maybe drilling to commence.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.