Civil engineering types ran some of the larger scale solar projects for a major contractor as delivery/construction/execution managers along the Murray river a few years ago.
Site prep, Clearing, Grubbing, site excavation, trenching, pile driving were big ticket items, mechanical assembly of the trackers, mounting of the panels, landing of very heavy inverters & transformers & their pads, staging co-ordination of hundreds of thousands of solar panels & containers, even the HV cable runs are heavy machinery dependent.
There is a fair amount of labour required for the tracking assembly & mounting panels on the trackers.
The electrical installation component happens more towards the end - much like a house fit off - laying cables in trenches, connecting panels, fitting off Cables from combiner boxes to inverters, string cables etc.
As with the above, the major labour component is related to plug & play connection & cable tying/conduit installation related to the PV panel strings.
Then commissioning - but not a big labour component & not a long time to do this.
Solar PV farm design is a well trodden path & supply chains mature.
- Forums
- ASX - By Stock
- LKE
- LKE towards TOP-5
LKE towards TOP-5, page-22812
-
-
- There are more pages in this discussion • 1,330 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
-0.002(3.51%) |
Mkt cap ! $95.54M |
Open | High | Low | Value | Volume |
5.7¢ | 5.8¢ | 5.5¢ | $385.5K | 6.908M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 101457 | 5.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.6¢ | 59697 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 101457 | 0.055 |
8 | 268129 | 0.054 |
8 | 210135 | 0.053 |
4 | 689310 | 0.052 |
7 | 833031 | 0.051 |
Price($) | Vol. | No. |
---|---|---|
0.056 | 59697 | 1 |
0.057 | 508000 | 2 |
0.058 | 355258 | 6 |
0.059 | 691737 | 7 |
0.060 | 405382 | 10 |
Last trade - 16.10pm 11/11/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |
The Watchlist
3DA
AMAERO INTERNATIONAL LTD
Hank Holland, Executive Chairman and CEO
Hank Holland
Executive Chairman and CEO
Previous Video
Next Video
SPONSORED BY The Market Online