CTP 1.96% 5.0¢ central petroleum limited

o2 drilling update, page-3

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    Bit disappointing this delay.

    Could b issues with the BOP, not the casing as such.
    Running the 9" casing at 486m + waiting on cement is not a lengthy process. max 36-48 hrs.

    Setting up the BOP & pressure testing is the tricky bit.
    So unless this is sorted out, they can't drill which seems 2b the case for now. Atleast the well should b secure, IMO.


 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.