    It's been a month of further developments for LMG and we are excited to share with you some of our highlights.

    Demonstration Plant Progress -

    Equipment Arriving On Site

    We have a number of completed equipment packages arriving on-site. Four (4) Reduction Furnace modules out of seven are now
    complete. Supporting frames for the reduction furnace as well, lined condenser galleries, and the furnace side wall are complete. Our steam boiler, made locally by Thermal & Pressure Engineering, is a vital component in a chemical plant as it plays a crucial role in producing steam, has been delivered and locally commissioned. Our vacuum pump system has also arrived, which is used to remove air and other gases from the process to create a vacuum environment

    https://hotcopper.com.au/data/attachments/5363/5363342-07fd251f11c757548c5101b556125b25.jpg
    Reduction Furnace Modules

    https://hotcopper.com.au/data/attachments/5363/5363346-b0fe6d25590279da3abab6a38e6fabdc.jpg
    Steam Boiler

    https://hotcopper.com.au/data/attachments/5363/5363348-c432a330e03a9f821201e23dc3459932.jpg
    Vacuum Pump System

    https://hotcopper.com.au/data/attachments/5363/5363351-efa6f7abd6fede9282a632263e36e2bc.jpg
    Reduction Furnace Supporting Frames

    Additionally, equipment deliveries have been received by VEEM for all 30 retort tubes used in the Reduction Furnace as well as progressive deliveries for our Spray Roaster, engineered by Tenova.
    https://hotcopper.com.au/data/attachments/5363/5363356-7f1f96c8f21b067a52ea16242340f7c0.jpg
    https://hotcopper.com.au/data/attachments/5363/5363365-53b4867a141110daecffee3a2a6082e0.jpghttps://hotcopper.com.au/data/attachments/5363/5363362-a7ed6cb27523c4b29fce2a08575d46d6.jpg
    Spray Roaster, Retort Deliveries and Storage



    Stage 2, 10,000+ tpa Magnesium Plant

    Stage 2 will follow on from the successful completion of the Stage 1 Demonstration Plant.

    The results from the Geotech work required to be completed on the Yallourn landfill will determine the annual production size of the commercial plant, however, LMG believes that Yallourn will produce sufficient fly ash from now until closure in 2028 to operate a 10,000 tpa magnesium plant for 20 years.

    https://hotcopper.com.au/data/attachments/5363/5363417-86799cffeede13aa4a3d410d14fb180f.jpg


    Stage 3, 100,000 tpa Magnesium Plant
    https://hotcopper.com.au/data/attachments/5363/5363426-6df83f8d9845f51f5fe0eb40dab1d3b9.jpg

    We've selected the perfect location for our new Stage 3, 100,000tpa project, and we couldn't be more thrilled about the possibilities it holds!

    ‘A key advantage of the Samalaju site is the presence of hydroelectric power generation, meaning LMG can potentially operate with 100% renewable power.’ David Patterson LMG CEO.
    https://hotcopper.com.au/data/attachments/5363/5363420-3e827dc32519b1a22fe8e2e0cb6580dd.jpg
    Demand For Magnesium Is Soaring
    Magnesium, the superhero of the metals, is taking the world by storm!
    https://hotcopper.com.au/data/attachments/5363/5363377-cb87a1141485a999b133fdf73d9c1a4b.jpg

    Its lightweight nature makes it a valuable
    resource for traditional uses like die casting and aluminium alloys, but that's not all—the metal is also powering new-age technologies such as bioresorbable stents and magnesium batteries. Thanks to its incredible strength-to-weight ratio, magnesium is 25% lighter than steel (while still being stronger) and one-third lighter than aluminium or titanium.


    We’re grateful for your support and interest in the LMG vision. Let's work together to spread the word and create a more sustainable future for us all by sharing our newsletter with your friends and colleagues.


 
watchlist Created with Sketch. Add LMG (ASX) to my watchlist
(20min delay)
Last
4.7¢
Change
-0.001(2.08%)
Mkt cap ! $103.0M
Open High Low Value Volume
4.6¢ 4.8¢ 4.6¢ $49.09K 1.047M

Buyers (Bids)

No. Vol. Price($)
1 64217 4.6¢
 

Sellers (Offers)

Price($) Vol. No.
4.7¢ 90574 1
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
LMG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.