My point was there's little point in proving logistics 8 months short of production, you'd only have to start from scratch again later.
Better to be shipping two shiploads of DSO from 3 months out, and right up to first production - then you get to keep all the drivers, rigs, systems that you've proven it up with.
DSO this year was mostly about the money - we no longer need it.
Anyway, it's not up to me. Whatever they think works best, I'll be fine with.
- Forums
- ASX - By Stock
- LLL
- Ann: Significant Goulamina Resource Upgrade 48% Increase to 211Mt
Ann: Significant Goulamina Resource Upgrade 48% Increase to 211Mt, page-107
-
-
- There are more pages in this discussion • 79 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.0M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable