EDE 25.0% 0.2¢ eden innovations ltd

Ann: Investor Presentation, page-33

  1. 7,705 Posts.
    lightbulb Created with Sketch. 2797
    LMAO. The concrete used runways and aprons is nearly a metre thick and takes several years to fully cure. No engineer is ever going rip up a slab just to level the base. The will just grind the edges and/or patch. The only time time the slab will be removed is when it needs to be totally replaced. This typically happens after 50+ years.
 
watchlist Created with Sketch. Add EDE (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
-0.001(25.0%)
Mkt cap ! $6.162M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $188 125K

Buyers (Bids)

No. Vol. Price($)
65 207377418 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 25084670 19
View Market Depth
Last trade - 10.24am 02/09/2024 (20 minute delay) ?
EDE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.