MAY 4.35% 2.2¢ melbana energy limited

Ann: Alameda 2 First Production Results, page-383

  1. 330 Posts.
    lightbulb Created with Sketch. 7151
    Hi alexei ii,

    The revised Prospective Resource that I calculated for the 63m of net section has used McDaniel's Prospective Resource for MAY's 30% which has been derived by McDaniel's from their Oil-In-Place volume using a Recovery Factor of 4.8 - 5% (Slide 1).

    In Slide 2, I've made the best estimate I can of how the current Amistad Units 1a/1b, 2 & 3, as described on the section in ASX 5/7/23, relate to MAY's Stratigraphic Column schematic from the drilling of Alameda-1. I've based this on working up from the Serpentinite zone that defines Unit 3's top seal.

    GLTAH
    Cheers
    VOGC


    https://hotcopper.com.au/data/attachments/5415/5415270-018531d57bb47e3b607b743ed4b3ee5e.jpg


    https://hotcopper.com.au/data/attachments/5415/5415281-7440fd96e3fee774347ca7dfd2918aa4.jpg




 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.4¢ 2.4¢ 2.1¢ $444.7K 19.98M

Buyers (Bids)

No. Vol. Price($)
3 2048367 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1402823 5
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.