IVZ 1.41% 7.2¢ invictus energy ltd

Ann: Mukuyu-2 Appraisal Well Location Selected, page-204

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    Hi VOGC,

    There might be practical reasons why side tracking as you've described it isn't a feasible option.

    To side track in open hole isn't too complex. You plug back to above your kick off point and go in with a motor assembly.

    Drilling a side track from a well that's been cased to TD would require setting a whip stock and milling through casing to initiate a sidetrack. Once you've set the whipstock and drilled the side track further operations in the old bore would require plugging back the sidetrack and removing the whipstock. Im not sure how feasible that is and the cost of the hole operation would be much higher than for a simple open hole sidetrack.

    Petre and others have more experience than I do in this sort of operation so I'll let them add further comment.
    Last edited by Kiwigeo8339: 16/07/23
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.