The presentation says drop in production FY25 due 3 month gap feed stockpile, lower recoveries, capacity constraint
My understanding Bp 33 there no guidance of production included in FY25.. but I think JP Morgan may have included in their research.. ie ... May explain how they came up with 180kt estimate.
so FID CY24 Q1.. probably March 2024?.. and feasibility study completed in FY25 QTR 1.. June 2025?.. enabling works already commenced..these are surface works . I think you need a shortlist preferred o&m and EPCM do proceed with FID.. to get understanding of Capex requirements..so how long does it build processing plant.. may not be enough time for FY25
- Forums
- ASX - By Stock
- CXO
- Banter and general comments
Banter and general comments, page-29426
-
- There are more pages in this discussion • 9,533 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.003(3.09%) |
Mkt cap ! $213.6M |
Open | High | Low | Value | Volume |
10.0¢ | 10.5¢ | 9.8¢ | $1.085M | 10.84M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 1163060 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 4073854 | 56 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
33 | 1487052 | 0.100 |
18 | 762294 | 0.099 |
13 | 538723 | 0.098 |
12 | 648792 | 0.097 |
15 | 1366343 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 4082639 | 57 |
0.110 | 2396206 | 46 |
0.115 | 1432875 | 30 |
0.120 | 905959 | 27 |
0.125 | 601199 | 17 |
Last trade - 12.36pm 11/07/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |