Spot on. Coburn success or failure will be determined in the mine and no where else. How efficiently they handle (or god forbid rehandle) overburden and in pit tailings will determine Strandline's fate. A few mechanical failures is NOT a determining factor. Neither is the operation of the MSP - as we've seen they have sold HMC direct to market. Investors forget that this is an extremely low grade mineral deposit. If they could, they'd dredge it, but they can't so they're stuck with the more expensive option of dry dredging. The whole thing is about mining cost
- Forums
- ASX - By Stock
- STA
- Ann: Coburn Project Commissioning of WCP Advancing Rapidly
Ann: Coburn Project Commissioning of WCP Advancing Rapidly, page-89
-
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online