MAY 2.86% 3.4¢ melbana energy limited

May Chart, page-10087

  1. 4,050 Posts.
    lightbulb Created with Sketch. 673
    There is also the possibility that APs has thrown out BS timelines of flow testing. Alot of companies flow test at a later time once the Geo's have had enough time to analyse the wireline logs to plan for the best perforation zone's for the hole.

    Imagine the Ruckus here if the next announcement is the rig is being moved to drill Alameda 3 and flow testing has been delayed until logs have been analysed properly
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.4¢
Change
-0.001(2.86%)
Mkt cap ! $114.5M
Open High Low Value Volume
3.6¢ 3.6¢ 3.3¢ $398.3K 11.51M

Buyers (Bids)

No. Vol. Price($)
11 2415300 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.4¢ 356323 1
View Market Depth
Last trade - 14.59pm 01/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.