MAY 4.17% 2.3¢ melbana energy limited

Ann: Block 9 Alameda 2 Increase in Net Pay, page-47

  1. 4,214 Posts.
    lightbulb Created with Sketch. 709
    Just don't believe any of AP's timelines and it will put everyone's head in a better space.

    Sherrit are running this campaign to its own timelines and what I see is a flow test campaign to how it should be run. You need to analyse the wireline logs correctly to perforate the exact zones you are trying to test.

    With Ap's timelines it gave the Geo's what 1 day to analyze the logs before they go ahead and perforate and flow test without any proper planning which made no sense in the first place.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
-0.001(4.17%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.3¢ 2.4¢ 2.3¢ $37.16K 1.559M

Buyers (Bids)

No. Vol. Price($)
10 1371447 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 42608 1
View Market Depth
Last trade - 16.10pm 24/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.