Only two new additional assay results, ANRD17 and ANDD228, however they are drilled mostly in the known mineralisation zone.
Estimated AP11 volume from drilling area so far of 27,179,000 * 2.7 = 73.3Mt
Updated estimated AP11 volume with addition of new drillholes: 36,478,000 * 2.7 =
98.49Mt! AP11 only!And assuming the modelled strike of AP11 is continuous with outcrop: 65,753,000 * 2.7 = 177.53Mt
My model proved exceptional in determining the width of ANDD228, however I didn't have access to collar details for ANRD17 prior to this release.
- ANDD228 expected: 185m
- ANDD228 actual: 183m
As I said before, top 3 resource potential in Australia which will compete with Greenbushes, Pilgangoora and Wodgina.