nice, but holy crap they are taking their time - must be something big brewing.
Speculating they had a big surprise during wireline logging Zone 3 and had to update net pay again - then ran the flow test and felt the need to independently verify results before releasing to market.
Usually when it's a duster the news hits pretty quick. To those saying Zone 3 was a duster so he's doing Zone 2 to cover bad news are clueless, that would violate the ASX rules. Also if they had technical delays or engineering issues they would have to disclose that as well, leaving the only real possibility which is good flow and a size upgrade. Would not be surprised to see MAY hitting a huge new ATH this week.
- Forums
- ASX - By Stock
- MAY
- Ann: Block 9 Alameda 2 Increase in Net Pay
Ann: Block 9 Alameda 2 Increase in Net Pay, page-738
-
- There are more pages in this discussion • 97 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
|
|||||
Last
2.3¢ |
Change
-0.009(28.1%) |
Mkt cap ! $77.51M |
Open | High | Low | Value | Volume |
2.8¢ | 2.9¢ | 2.1¢ | $1.656M | 68.27M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 3909224 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 2254933 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 260706 | 0.025 |
1 | 47500 | 0.024 |
4 | 576738 | 0.023 |
6 | 3058543 | 0.022 |
19 | 1980820 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.022 | 282941 | 2 |
0.023 | 417000 | 4 |
0.024 | 2233933 | 10 |
0.025 | 4233352 | 7 |
0.026 | 4809166 | 8 |
Last trade - 16.10pm 11/07/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |