MAY 3.13% 3.3¢ melbana energy limited

Ann: Block 9 Alameda 2 Increase in Net Pay, page-814

  1. 231 Posts.
    lightbulb Created with Sketch. 286
    Back in Nov 2021...this was said (I believe this is at the U3 reservoir)

    Given the increase in pressure detected at approximately 1,800 metes it was important that theseremedial works be completed to the standard required by the well design before drilling forward. Inparallel to undertaking these works an additional mud gas separator was installed to give the rigenhanced capacity.2017 - engle C.Analysis of an oil sample previously collected reported an API of 15°, lighterthan the nearby Varadero field (reportedly 10 - 14° API).Samplingconditions were not optimum, however, and better samples will beattempted to be collected and reanalysed at the next opportunity.

    Could surprise with a higher than 11.5 API...maybe, just maybe
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.