We still have the Energy Ink program of work that is in progress at present plus the drilling of Leviathan, no need for more stories at present.
Annual results announcement this week or next and then a presentation with the AGM in late September or perhaps they will hold off until they are ready to make an announcement about the Energy Ink fabrication and testing.
Just reviewing my notes, and we are due information about this Energy Ink Cube this quarter, so perhaps that will come out just before the AGM.
- Forums
- ASX - By Stock
- SOR
- Ann: SOR Moisture Energy Pathway to Solar Power Density
Ann: SOR Moisture Energy Pathway to Solar Power Density, page-102
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SOR (ASX) to my watchlist
|
|||||
Last
4.2¢ |
Change
-0.004(8.70%) |
Mkt cap ! $19.68M |
Open | High | Low | Value | Volume |
4.6¢ | 4.6¢ | 4.1¢ | $56.81K | 1.321M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 189999 | 4.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.9¢ | 61157 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 189999 | 0.042 |
3 | 202722 | 0.041 |
11 | 510391 | 0.040 |
2 | 37693 | 0.039 |
1 | 263000 | 0.038 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 61157 | 2 |
0.051 | 85891 | 2 |
0.053 | 50000 | 1 |
0.055 | 8389 | 2 |
0.059 | 55000 | 2 |
Last trade - 16.10pm 25/07/2024 (20 minute delay) ? |
Featured News
SOR (ASX) Chart |