OD6 2.50% 4.1¢ od6 metals limited

Ann: Phase 3 Drilling Complete at Splinter Rock REE Project, page-18

  1. 3,099 Posts.
    lightbulb Created with Sketch. 735
    LOL. You sir a a knob .. I like that. Funny call Ace.

    Clearly you have no idea.

    A 24 hour leach time is despicable. Think about it. The plant would have to be 400% larger to process the same amount of ore than a 6 hour leach for the same amount of product. Think of how uneconomic that is.

    The lower the leach time, the more ore that can be processed daily.

    Acid use, leach time, recoveries and basket value sets up the basis of economics. MRD has an average basket value. The acid use is expensive HCI, the leach time is a total joke.

    Sorry if my opinion offends you but it is 100% truth, take it or leave it.
 
watchlist Created with Sketch. Add OD6 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.