    On the list below, GT1 is approaching mid-game, particularly if one or two more key items flip into the completed category:

    Some of the steps to production are below:
    • Raise initial capital ✔
    • Acquire tenements (possibly with known drilling results) ✔
    • Surface sampling to identify targets ✔
    • Gain a better understanding of the ground geology eg aerial magnetics ✔
    • Drill targets and hopefully hit mineralised pegmatites ✔
    • Drill more to get some idea of the broad size ✔
    • Typically raise more capital to drill more extensively ✔
    • Drill/investigate so as to define a JORC resource ✔
    • Undertake Met test work to establish concentration methods that work and potential recoveries ✔
    • Work with potential buyers so as to agree an offtake ✔
    • Complete all investigations necessary so as to submit permit applications (which may have multiple phases) ✔
    • Have a resource including significant Measured and Indicated at Seymour ✔
    • Identify proposed locations for processing plant ✔
    • Undertake sterilisation drilling to confirm plant locations aren't over a new ore body ✔(?)
    • Undertake high level work to confirm economics (not necessarily published, may involve assuming mining inferred) ✔

    Key steps remaining for GT1:
    • Reach agreement with first nations around mining (rather than just exploration drilling)
    • Confirm the plant configuration for mining the resource including any initial/later phases
    • Define either a large JORC or a JORC resource that is close to as large as the resource will enable
    • Re Root, drill some more so as to have most resource at indicated and at least the first few years at Measured
    • Formal studies around developing the resource (Scoping, Feasibility)
    • Convert exploration permits into a Mining Licence
    • Receive permits to construct a mine / build concentration plant
    • Agree offtakes for a large proportion of planned early output
    • Secure sufficient finance to develop the resource
    • Make a final investment decision (FID)
    • Construct enabling access to logistics (eg if available grid power, water, roads main roads/rail networks)
    • Order long lead time items
    • Build facilities to support digging / processing ore including tailings management
    • Dig and extract ore
    • Build or arrange for someone to build a crushing plant
    • Build a concentration plant
    • Successfully commission the mine

    Phases may not occur in this order. GT1 has a few more steps that are fully within its control but soon its the big 3 that involve others: Permits, Offtakes and Finance.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.2¢
Change
0.000(0.00%)
Mkt cap ! $15.20M
Open High Low Value Volume
3.2¢ 3.2¢ 3.0¢ $5.102K 163.7K

Buyers (Bids)

No. Vol. Price($)
6 274355 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 219764 1
View Market Depth
Last trade - 16.10pm 07/08/2025 (20 minute delay) ?
GT1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.