Front-End Engineering Design (FEED) - The FEED is basic engineering, which comes after the Conceptual design or Feasibility study. The FEE design focuses the technical requirements as well as rough investment cost for the project. The FEED can be divided into separate packages covering different portions of the project. The FEED package is used as the basis for bidding the Execution Phase Contracts (EPC, EPCI, etc) and is used as the design basis. - Wikipedia
- Forums
- ASX - By Stock
- ARU
- Livewire: buy the dip?
Livewire: buy the dip?, page-23
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARU (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $462.0M |
Open | High | Low | Value | Volume |
20.0¢ | 20.0¢ | 18.8¢ | $990.7K | 5.075M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 265573 | 19.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 1687189 | 51 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 177183 | 0.190 |
25 | 966633 | 0.185 |
37 | 2612433 | 0.180 |
29 | 1857607 | 0.175 |
40 | 1316722 | 0.170 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 1089416 | 43 |
0.205 | 661255 | 13 |
0.210 | 2408275 | 20 |
0.215 | 378785 | 7 |
0.220 | 860336 | 16 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
ARU (ASX) Chart |