I'd be surprised if the seismic cost 5 million. It was half the size of the first lot. 839 sq km - 425 sq km.
All the Polaris trucks were in Harare so I'd expect second 2D to be less than half the first 2D BUT I have no clue what first 2D cost but I doubt it was 10 million.
I'd say this 2D 3 million tops + interpretation.
I personally believe the well should/could be drilled sub 20 million.
105 days to drill Mk1 + St @ $180k per day quoted by Butch = ~ 19 million on its own.
55 day well @ $180k per day ~ $ 9.9 million.
By the way $180k per day is absolutely over the top for a land based drill rig and I suspect most of that 180K per day can be attributed to Bakered screwing the pooch.
https://www.plantengineering.com/articles/onshore-rig-global-day-rate-data-and-insights/
- Forums
- ASX - By Stock
- IVZ
- Ann: Securities Placement Capacity Update
Ann: Securities Placement Capacity Update, page-93
-
- There are more pages in this discussion • 93 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.8¢ |
Change
-0.002(2.86%) |
Mkt cap ! $96.41M |
Open | High | Low | Value | Volume |
6.9¢ | 7.2¢ | 6.8¢ | $126.3K | 1.801M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 359797 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.0¢ | 114000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 359797 | 0.068 |
5 | 225291 | 0.067 |
3 | 135873 | 0.066 |
2 | 768000 | 0.065 |
3 | 184124 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.070 | 114000 | 2 |
0.071 | 99434 | 1 |
0.072 | 30000 | 1 |
0.073 | 425000 | 3 |
0.074 | 300000 | 2 |
Last trade - 15.34pm 09/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |