Majority of their resource is shallow OP which should help to bring some profitable revenue in early in the ramp up.
I'll be interested to know if any new Metallurgy works (regarding anticipated recovery rates) have been completed at all as part of the PFS? Or maybe they will they just base recovery rates from the historical workings of these deposits? With a view to complete them as part of the DFS.
'Flag' looks to have some upside at depth (below the previous Norseman gold workings from the 80s), the grades look very impressive but to date the widths have been very narrow, some extra drilling of them as part of the DFS would be welcomed.
Either way this PFS will further derisk the project economically and help to build the case to build a profitable mine with a high LOM.
- Forums
- ASX - By Stock
- MM8
- MM8 Discussion
MM8 Discussion, page-74
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MM8 (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.3¢ |
Change
0.003(4.29%) |
Mkt cap ! $29.76M |
Open | High | Low | Value | Volume |
7.1¢ | 7.5¢ | 7.1¢ | $68.96K | 953.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 237200 | 7.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.6¢ | 62641 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 237200 | 0.073 |
1 | 100000 | 0.072 |
1 | 42253 | 0.071 |
1 | 41428 | 0.070 |
1 | 39215 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.076 | 62641 | 1 |
0.078 | 5200 | 1 |
0.079 | 10000 | 1 |
0.080 | 80663 | 1 |
0.092 | 9100 | 1 |
Last trade - 14.44pm 10/10/2024 (20 minute delay) ? |
Featured News
MM8 (ASX) Chart |
The Watchlist
EL8
ELEVATE URANIUM LTD
Murray Hill, MD & CEO
Murray Hill
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online