MAY 3.57% 2.7¢ melbana energy limited

Ann: Block 9 - Early Production and Spud of Alameda-3, page-426

  1. 3,134 Posts.
    lightbulb Created with Sketch. 1040
    So can confirm there was in fact downhole gauges in A2, can't confirm if they are still there or not or wether they failed or not..unfortunately !
    AP wouldn't or couldn't give me the data stating that all that was required re LR5 requirements were in the table attached to the announcement on the 28th August

    https://hotcopper.com.au/data/attachments/5635/5635218-9ee103e03532ca8e7bffc2d1ee1b978c.jpg Im still of the opinion its high pressure due to A1 results stating high pressure and the stable flowrate at 36/64 choke during a 12 hour period averaging ~1200 bpd
    AP also said that the upcoming production is about "maximising resivour information and shaking down logistical and custody transfer

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.7¢
Change
-0.001(3.57%)
Mkt cap ! $90.99M
Open High Low Value Volume
2.9¢ 2.9¢ 2.7¢ $87.74K 3.087M

Buyers (Bids)

No. Vol. Price($)
5 848777 2.7¢
 

Sellers (Offers)

Price($) Vol. No.
2.9¢ 284679 3
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.