They can tell a lot from the visuals of the drill holes even though they are only RC chips - ie the length of the pegmatite and also if there is a decent amount of spodumene in the chips. So they do know something we don't ie visuals of RC chips and must be encouraged enough to bring in a DD rig. It is my understanding they need DD cores to do met testing, studies (eg SS, PFS) etc so thats another reason for bringing in a DD (see the 3 October announcement which makes this very point).
While they can use DD to drill some deep holes to the lower parts of the potential deposit I am surprised they have not drilled deeper holes with the RC rigs as RC rigs can drill to 200m to 300m but to date holes drilled to date only have an average depth of 100m - quite puzzling.
- Forums
- ASX - By Stock
- IR1
- Ann: Diamond Drilling to Commence at the Beecher Project
IR1
iris metals limited
Add to My Watchlist
0.00%
!
8.9¢

Ann: Diamond Drilling to Commence at the Beecher Project, page-52
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
8.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.83M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 13940 | 8.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.9¢ | 42000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 13940 | 0.088 |
2 | 101162 | 0.086 |
1 | 40000 | 0.085 |
1 | 119047 | 0.084 |
1 | 30000 | 0.082 |
Price($) | Vol. | No. |
---|---|---|
0.089 | 42000 | 1 |
0.090 | 55211 | 2 |
0.095 | 9000 | 1 |
0.099 | 13864 | 1 |
0.100 | 45000 | 2 |
Last trade - 13.43pm 22/07/2025 (20 minute delay) ? |
Featured News
IR1 (ASX) Chart |
Day chart unavailable