1. The 1mt had been the plan, even mentioned in the BFS. Considering you read so much of the documents to the point of requesting more from EPA, shouldn’t you already know this?
2. Why would getting Muchea running cost significantly more than Arrowsmith? Care to put some number there?
Especially in your scenario with Arrowsmith producing 1mt, even with Muchea doubling/tripling the cost of Arrowsmith to get to approval, how significant would dilution/debt/revenue offset would be?
I can agree with you with putting this in the drawer and wait wait and wait. Let’s do that shall we? And ramp down the down ramp a bit.
- Forums
- ASX - By Stock
- VRX
- Ann: Results of SPP and Shortfall
Ann: Results of SPP and Shortfall, page-121
-
- There are more pages in this discussion • 132 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VRX (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
-0.001(2.50%) |
Mkt cap ! $25.75M |
Open | High | Low | Value | Volume |
4.1¢ | 4.1¢ | 3.6¢ | $4.395K | 116.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 31398 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 223437 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 31398 | 0.036 |
4 | 362718 | 0.035 |
1 | 100000 | 0.034 |
1 | 50000 | 0.033 |
2 | 4922 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 223437 | 1 |
0.041 | 313234 | 3 |
0.042 | 328937 | 3 |
0.043 | 9523 | 1 |
0.044 | 200000 | 1 |
Last trade - 11.43am 08/10/2024 (20 minute delay) ? |
Featured News
VRX (ASX) Chart |