IVZ 3.70% 7.8¢ invictus energy ltd

Ann: Mukuyu-2 Drilling Update, page-120

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    "what sort of time frame to case this section and resume drilling? "

    Announcement mentions Preparing to drill the 8-1/2" hole section. That implies that 9-5/8" casing has been run and cemented. Usually a new hole hole section begins at that point for reporting purposes.

    Forward operations:

    - BOP test
    - Run in hole with drilling assembly
    - drill out casing shoe
    - Perform leak off (test taken all the way to the point where fracturing starts) or Formation Integrity test (test taken to a set frac pressure) to establish frac gradient for next hole section. This is a critical step as it dictates how far we can drill with the 8-1/2" hole section.
    - drill ahead 8-1/2" hole to TD.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
7.8¢
Change
-0.003(3.70%)
Mkt cap ! $110.5M
Open High Low Value Volume
8.0¢ 8.1¢ 7.7¢ $151.9K 1.932M

Buyers (Bids)

No. Vol. Price($)
2 237927 7.8¢
 

Sellers (Offers)

Price($) Vol. No.
7.9¢ 255554 4
View Market Depth
Last trade - 16.10pm 23/07/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.