CVV 6.06% 17.5¢ caravel minerals limited

Caravel Copper Project - Bankable Feasibility Study, page-114

  1. 975 Posts.
    lightbulb Created with Sketch. 137


    NPV = Net Present Value = basically, a calculation of the value of a future stream of income minus payment outflows over the project life (used to calculate profitability).

    CVV NPV is ~$2 billion dollars at a copper price of US$4.00/lb...... and NPV rises by ~$1 billion dollars for every US$0.50c increase in copper prices above a copper price of US$4.00/lb. So at a copper price of $US$4.50/lb, NPV = ~$3 billion dollars.

    https://hotcopper.com.au/data/attachments/5654/5654120-644a2f0f68b88a6ec78a6b511f5305e7.jpg


    As per below: "Expected overall C1 (cost of mining), reduced from US$1.54/lb to US$1.23/lb copper".




    https://hotcopper.com.au/data/attachments/5654/5654122-3d020680c75302ae94234d6bc15304af.jpg

    You're wrong again, Buddy.



 
watchlist Created with Sketch. Add CVV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.