The 2019 DFS has the WCP con being attritioned after the cleaner spirals at the end, which is probably normal to cheaply prep the con for MSP. As you point out further below, the 2019 DFS (used for mine build as 2020 Update didn't mention change) doesn't have a MSP attritioning step inserted into the process diagram... does that mean the 2010 attriioning step was removed as 'non-viable' for the final design, or it was included as a pre-MSP step (most likely imo)?
- Forums
- ASX - By Stock
- STA
- Ann: Second Shipment of Chloride Ilmenite Completed at Coburn
Ann: Second Shipment of Chloride Ilmenite Completed at Coburn, page-16
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
RNU
Renascor wins a funding boost given it wants to produce a critical mineral – but $5M award pales in comparison to some
FWD
Queensland's housing crisis an opportunity for ASX builder Fleetwood – and taxpayer cash a safe harbour from the storm
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable