RR1 10.0% 1.1¢ reach resources limited

Re rate happening, page-2564

  1. 1,982 Posts.
    lightbulb Created with Sketch. 394
    The conference (video) with JB was great and highlights a great run into xmas with at least the next 4-6 weeks being jam packed.

    Just in regards to Morrissey Hill alone from his presentation
    • Flagship of REACH RESOURCES LIMITED if you like
    • Maiden drill program just undertaken
    • Geology - this site is fertile, granites the 33 supersweep
    • DLI Malinda 75000m drill significant finds in same location as ours RR1.
    • at the 1.19m mark while our guys were on site they walked and mapped the ground and uncovered other targets which has only enhanced our confidence in our project.
    • Assay results Early Nov
    • Geo Chemist will run through the numbers
    • Encouraging signs at Morrissey Hill - Blind pegmatites found - Numerous finds with potential to increase the scale of what is there on site.
    • Potential of 10km of strike - again scale and confidence in the project
    • Heading back in November to drill.
    • Good relationship with traditional owners - allowing for future works.
    • Tenement wide geo chemical soil samples.
    • Phase 1 results coming Early November
    • Phase 2 drilling commencing later in November

    Onwards and upwards REACHERS.
 
watchlist Created with Sketch. Add RR1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.