IVZ 1.33% 7.4¢ invictus energy ltd

IVZ Share Price, page-15753

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    M-1

    - drilled with an excessively high mud weight and a less than adequate rig mud system.
    - time dependent hole deterioration with major root cause being mud system.
    - Multiple equipment failures with Mudlogging, LWD and wireline services supplied by Baker.
    - unable to penetrate Lower Angwa

    M-2

    - drilled with a much lower mud weight and an upgraded rig mud system.
    - Mud engineering overseen by a consultant with experience in wells in Kenya with similar issues to M1.
    - Geolog handling Mudlogging
    - Wireline being handled by SLB
    - Independent QA/QC people overseeing wireline and LWD services.
    - Well structurally higher than M1 so able to penetrate Lower Angwa.
    - numerous other learnings from M1 applied during drilling of M2 (eg bit and BHA selection)
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.