AWJ 0.00% 17.5¢ auric mining limited

Ann: Jeffreys Find Stage One Production Exceeds 9,400 Ounces, page-14

  1. 2,336 Posts.
    lightbulb Created with Sketch. 218
    Try the below calculations and see if your wrong on the first parcel.

    DFS 7600oz x $2600 = $19.76m total income -Based on 155kt ore mined shipped and milled.


    Reconciled 174kt -155 = 19 kt extra shipped and milled.


    DFS 19kt x $82 cost ($32 trucking and $50 milling.)=$1.558m extra costs incurred.


    Actual costs/$18.674 expenses and cash held back includes 50% share to partner of $2.2m


    $18.674 -$1.558m for extra ore handling = $17m


    $17m divided by 7600 oz = 2236 per oz


    Assuming 28.4 g/oz and 1.58g/ton 90% yield

    =28.4g div 1.44g/ton = 19.8 tons milled ore /per oz yield


    18.764m div 174 kt ore milled = $108/ton cost ore mined and processed


    19.8tons x $108/ton = $2136/oz cost first parcel.

    Regards
 
watchlist Created with Sketch. Add AWJ (ASX) to my watchlist
(20min delay)
Last
17.5¢
Change
0.000(0.00%)
Mkt cap ! $25.99M
Open High Low Value Volume
17.5¢ 17.5¢ 17.0¢ $102.7K 592.7K

Buyers (Bids)

No. Vol. Price($)
3 300000 17.0¢
 

Sellers (Offers)

Price($) Vol. No.
18.0¢ 238823 4
View Market Depth
Last trade - 15.17pm 26/06/2024 (20 minute delay) ?
AWJ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.