Try the below calculations and see if your wrong on the first parcel.DFS 7600oz x $2600 = $19.76m total income -Based on 155kt ore mined shipped and milled.
Reconciled 174kt -155 = 19 kt extra shipped and milled.
DFS 19kt x $82 cost ($32 trucking and $50 milling.)=$1.558m extra costs incurred.
Actual costs/$18.674 expenses and cash held back includes 50% share to partner of $2.2m
$18.674 -$1.558m for extra ore handling = $17m
$17m divided by 7600 oz = 2236 per oz
Assuming 28.4 g/oz and 1.58g/ton 90% yield
=28.4g div 1.44g/ton = 19.8 tons milled ore /per oz yield
18.764m div 174 kt ore milled = $108/ton cost ore mined and processed
19.8tons x $108/ton = $2136/oz cost first parcel.
Regards
- Forums
- ASX - By Stock
- AWJ
- Ann: Jeffreys Find Stage One Production Exceeds 9,400 Ounces
Ann: Jeffreys Find Stage One Production Exceeds 9,400 Ounces, page-14
-
- There are more pages in this discussion • 39 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AWJ (ASX) to my watchlist
(20min delay)
|
|||||
Last
17.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.99M |
Open | High | Low | Value | Volume |
17.5¢ | 17.5¢ | 17.0¢ | $102.7K | 592.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 300000 | 17.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 238823 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 300000 | 0.170 |
5 | 140855 | 0.165 |
2 | 103739 | 0.160 |
3 | 335000 | 0.155 |
3 | 145048 | 0.150 |
Price($) | Vol. | No. |
---|---|---|
0.180 | 138823 | 3 |
0.185 | 267021 | 4 |
0.190 | 240000 | 1 |
0.200 | 79077 | 4 |
0.205 | 100100 | 2 |
Last trade - 15.17pm 26/06/2024 (20 minute delay) ? |
Featured News
AWJ (ASX) Chart |