LOL. Baker got the Moomba gig a bit after I left the place.
One reason I left the place was the very selective application of the work hours regulations. They'd be happy to have two Rig Supervisors on site but when it came to the Wellsite Geologists you generally had to handle a 30-40 hour wireline job solo. Add in a DST straight after the last wireline run and I was pretty rooted.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 wireline logging progress update
Ann: Mukuyu-2 wireline logging progress update, page-337
-
-
- There are more pages in this discussion • 350 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.1¢ |
Change
0.001(1.25%) |
Mkt cap ! $116.6M |
Open | High | Low | Value | Volume |
8.1¢ | 8.1¢ | 7.9¢ | $50.04K | 625.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 239133 | 7.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 239133 | 0.079 |
5 | 116605 | 0.078 |
3 | 212467 | 0.077 |
1 | 263157 | 0.076 |
4 | 330066 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.081 | 485201 | 2 |
0.082 | 370000 | 3 |
0.083 | 500000 | 3 |
0.084 | 445625 | 5 |
0.085 | 329625 | 1 |
Last trade - 15.38pm 16/08/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |