AZL 6.67% 1.6¢ arizona lithium limited

Ann: Commissioning of Pilot Plant Completed at Prairie, page-67

  1. 837 Posts.
    lightbulb Created with Sketch. 184
    The red flags continue. There is a fine line between battery grade and industrial grade lithium, but huge price difference. The pilot plant will struggle with grade/volume/cost. Unfortunately the pilot plant cannot give or project 2-3 years of production costs as maintenance is an unknown on all DLE systems, only by operating a system continuous for years can it be known. This probably wont get that far, its the battery grade they'll struggle with. The unknown third party isn't inspiring confidence. Eagerly awaiting figures from independent verification. GLTAH
 
watchlist Created with Sketch. Add AZL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.