" I assume the back up is not attached to the drill string"
Correct - only one tool locked into the end of the drill pipe
"They are likely, by now back in position."
Yes.
"Is it likely that they were concerned with differential sticking and instead of going to the bottom actually went for the top zone as a test for the problem?"
While working top down and then from bottom out with the tool is normal the actual plan will be based on a number factors. Risk of differential sticking would be one consideration, risk of tool failure before a sample is acquired and efficient use of rig time are other factors.
- Forums
- ASX - By Stock
- IVZ
- Ann: Mukuyu-2 fluid sampling progress update
Ann: Mukuyu-2 fluid sampling progress update, page-934
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.6¢ |
Change
-0.001(1.49%) |
Mkt cap ! $100.0M |
Open | High | Low | Value | Volume |
6.6¢ | 6.6¢ | 6.5¢ | $6.081K | 92.39K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3382 | 6.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.7¢ | 138139 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 272005 | 0.065 |
2 | 194792 | 0.064 |
5 | 425111 | 0.063 |
3 | 479487 | 0.062 |
4 | 800099 | 0.061 |
Price($) | Vol. | No. |
---|---|---|
0.067 | 138139 | 4 |
0.068 | 92728 | 2 |
0.069 | 161700 | 2 |
0.071 | 150000 | 1 |
0.073 | 15000 | 1 |
Last trade - 15.54pm 06/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |