IVZ 4.23% 7.4¢ invictus energy ltd

Ann: Mukuyu-2 fluid sampling progress update, page-1364

  1. 1,679 Posts.
    lightbulb Created with Sketch. 1184
    If you zoom in to a couple of key locations in that photo it looks to me like there’s only a single row of 9 pipes left in the rack and the 10th pipe from that row is on the hook slewing to the left and ready to go in the hole. They’re 30m lengths so that would put us at a current depth of around 3,400m. Which is great news because it means we’ve finished at the initial station at 2,934m from the previous announcements and have most likely finished with all of the Upper Angwa reservoirs. 3,400m (if correct) puts us well into the Lower Angwa and not far off TD. It would also mean that the MDT tool is working well which is great to hear. Be interesting to see if we’re out of the hole in time for an announcement tomorrow or if we have another long weekend to get through before a Monday result.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.