RDN 3.33% 3.1¢ raiden resources limited

Daily Discussion, page-2981

  1. 12,830 Posts.
    lightbulb Created with Sketch. 15645
    Well whatever you want to think , or what price you reckon its going to get to , there' still plenty of news in the pipeline to keep Investors keenly interested.


    Like for instance the metallurgical results from the 4204-metre m 49 diamond drill holes across 3 separate locations in their maiden drilling campaign at Mt Sholl , and which we are still waiting on results from Strategic Metallurgy as per following excerpts out of previous quarterlies.....

    The team at Strategic Metallurgy includes Nicholas ‘Nick’ Vines who has over 16 years’experience in the mining industry, working principally as a metallurgist specialising in nickelsulphide flotation

    Strategic Metallurgy, were involved in the process flowsheet development, and metallurgicaltest work, for the Azure Minerals (ASX:AZS) Andover Ni-Cu Project 18km east of Mt Sholl.

    The Company has commenced early discussions with downstream specialty battery productproducers, whereby on completion of the metallurgical evaluation program, Raiden will aimto provide samples of saleable nickel concentrates, suitable for the production of a batterygrade Nickel Sulphate from the Mt Sholl ore. The Company will aim to provide 5 to 10kilograms of concentrate material, which meets the specifications required to evaluate thepotential for nickel sulphate production.


    And there are of course a lot of demand for projects like this in the market at the present moment , and so it will be interesting to see how the partnering and / or potential offtakes unfold for this one ...... Especially given the work that ' Nick ' has done for AZS as per the above previous statements by RDN....sneaky.png

    So as of the September Quarterlies released to the market , we are still waiting on these results as are we awaiting no less than 6 mining tenements including TWO Tabba Tabba and TWO Roubourne tenements PLUS one Mt Sholl tenement which are still PENDING .

    The additional Tenement which is also still pending is the Pyramid Tenement E47/4307 which is pending from the Peter Romeo Gianni led Mining Equities Pty Ltd ( Old Acquaintance of Tolga's from the RGL days.....wink.png ).

    So you can see this tenement is the light green one I've circled in RED in the below Map which when added to RDN's existing Pyramid tenement E47/4300 makes for a very considerable package in its own right....., and which is not all that far away from all the goings on between AZS's Andover and RDN's Arrow project to the right and slightly south of these if you were to enlarge this map.


    https://hotcopper.com.au/data/attachments/5747/5747124-edad4ef896f08ee223c149180dc83bb8.jpg
 
watchlist Created with Sketch. Add RDN (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
0.001(3.33%)
Mkt cap ! $85.84M
Open High Low Value Volume
3.1¢ 3.2¢ 3.1¢ $153.3K 4.944M

Buyers (Bids)

No. Vol. Price($)
3 424970 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 1223598 7
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
RDN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.