Stage I Trial Mining activities at Burbankswas completed with Joint Venture partnerFMR Investments Pty Ltd, with treatment ofthe final 25,000 tonnes of ore undertaken inJuly and August 2022. It was mutually agreedthat the joint venture would conclude postprocessing of the final batch of ore. Over the2021/2022 financial year the joint ventureprocessed 64,700t and produced 2,671oz,inclusive of the final toll milling campaign inJuly 2022 producing 2,078oz. Greenstone hasgained invaluable technical, operating and costinformation from the joint venture trial miningoperations at Burbanks which will serve tomaterially de-risk any future operation
From the chairman's letter in the annual report.