I'm probably more convinced as well that the mud weight is still too high for the PA section and they've stuffed up the well design. The second Casing point should be lower into the UA but to do this they would need to redrill from 500m and probably do not have the cash or casing to do so. If it was a larger company with deeper pockets they would have probably suspended the well and done it properly instead of burning cash on a hope for the best sidetrack.
- Forums
- ASX - By Stock
- IVZ
- Ann: Hydrocarbon gas recovered & evaluation program forward plan
Ann: Hydrocarbon gas recovered & evaluation program forward plan, page-987
-
- There are more pages in this discussion • 678 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.7¢ |
Change
-0.001(1.47%) |
Mkt cap ! $103.1M |
Open | High | Low | Value | Volume |
6.8¢ | 6.8¢ | 6.7¢ | $28.73K | 427.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 485500 | 6.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.7¢ | 79770 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 87754 | 0.068 |
2 | 194997 | 0.067 |
4 | 400461 | 0.066 |
6 | 709935 | 0.065 |
3 | 532500 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 150000 | 1 |
0.072 | 405000 | 2 |
0.073 | 370281 | 3 |
0.074 | 453798 | 2 |
0.075 | 1381014 | 2 |
Last trade - 10.17am 04/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |