“Note that there were no issues with these coals during the earlier wireline runs so that would lower risk of issues with ledges while MDT is on wireline.”
I’m not 100% certain is this is accurate unfortunately. It took 7 days to complete the first two runs on wireline and this included a “minor tool failure” which we now understand is actually damage rather than an unforeseen malfunction. Even allowing for time to POOH, condition the well for logging, 1 x planned wiper trip and 1 x wiper trip to clear the shale obstruction in the Lower Angwa, 96hrs for two runs which would normally take 20hrs indicates that they were having hole stability issues long before they said anything to us about them. I think you were spot on when you said this is the biggest risk for the side track compared to differential sticking.
- Forums
- ASX - By Stock
- IVZ
- Ann: Hydrocarbon gas recovered & evaluation program forward plan
Ann: Hydrocarbon gas recovered & evaluation program forward plan, page-1066
-
-
- There are more pages in this discussion • 599 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.1¢ |
Change
-0.003(4.05%) |
Mkt cap ! $107.6M |
Open | High | Low | Value | Volume |
7.5¢ | 7.5¢ | 7.1¢ | $46.18K | 642.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 164923 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.2¢ | 150000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 164923 | 0.071 |
7 | 349914 | 0.070 |
3 | 536268 | 0.069 |
4 | 349117 | 0.068 |
5 | 314984 | 0.067 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 150000 | 1 |
0.075 | 244808 | 1 |
0.076 | 604216 | 3 |
0.077 | 590022 | 8 |
0.078 | 648125 | 7 |
Last trade - 16.10pm 09/10/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online